projects often leads to higher project costs down the road due to additional damages caused by failure to act.
10 Failure to Research
Proper planning is imperative to ensuring that projects get completed on time, and
siding and window replacement typically have a long planning process. Therefore, an association should start before the planned start date.
Weather sensitive projects such as asphalt seal coat 6-12 months in advance.
Weather sensitive projects such as asphalt seal coat and up early due to the short weather time frame in which these projects can be performed.
All other projects should start the research/bid process months in advance.
All other projects should start the research/bid advance to provide ample time for the bids to be received and the board to review them prior to making a decision.
RUFF CONSTRUCTION, INC.
ruffconstruction.com | 425.487.0702
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36