Apparently the Budget Numbers Were Fixed


William J. Stone, MEM-2164 wstone04@gmail.com


The anticipated expenditures in an annual project budget must be realistic in view of the funds available. Managers deplore overruns. In fact, it goes beyond that. They are ever watchful for ways to reduce costs, thereby freeing up moneys for other uses.


I once worked at a mine where a wide range of hydro- logic phenomena were covered by the monitoring plan. This effort included monitoring stream flow, sampling springs, monitoring water level and ground-water quality in wells. These monitoring tasks were shared with the U.S. Geological Survey. Their services were paid for by a fund-matching arrangement. That is, the cost was split equally between the mine and the survey.


Our portion of the annual cost always seemed high. One day the head of the hydrology department asked me if we couldn’t reduce it by eliminating some of the monitoring sites and analyses. We had completed a few seasons of monitoring by then and the results might show areas of redundancy.


I reviewed possible areas of unnecessary duplication and was able to recommend cutting back on a number of monitor- ing sites and activities. For example, I reduced the surface- water monitoring costs by converting to non-recording or crest gages on ephemeral streams, I reduced the number and location of springs sampled, I eliminated some of the wells that were close together or otherwise in non-unique positions and I trimmed the number of analytes in ground water, now that background values had been established.


This cut our annual cost to about half of what it had been. The boss approved and gave me the nod to present that cut to the U.S.G.S. The Survey agreed that by now we knew more and could indeed cut the things I’d suggested. However, they had been reviewing the monitoring program as well and decided a number of things should be added.


Guess what? That brought the cost back up to exactly the original value. Apparently they had to have that amount to cover operations in their District. The figures in the budget were fixed. I know now why my counterpart at an adjacent mine laughed and shook his head when I told him how I’d cut our cost of U.S.G.S. services in half. TIP: Don’t argue with federal budgets. Finances often trump science.


Dr. Stone has more than 30 years of experience in hydro- science and is the author of numerous professional papers as well as the book, Hydrogeology in Practice – a Guide to Characterizing Ground-Water Systems (Prentice Hall). Feel free to argue or agree with him by email: wstone04@gmail. com.


AIPG Membership Totals As of CPG / Active


CPG / Non-Practicing Prof. Member


Associate Member Young Professional Student Adjunct


Corporate Member TOTALS


As of


8/7/14 8/14/2015 3,302 371 948 40 70


2,741 1


7,472


3,222 409 950 51 86


3,155 1


7,873


New Applicants and Members can now be found on the AIPG website at http://aipg. org/membership/newappsmems.html


Section News can now be found on the AIPG website at http://aipg.org/sections/ sectionnews.html


For those who need only an occasional search of the GeoRef database, it is easy to request a GeoRef custom search. A member of the GeoRef staff will conduct the search according to your specifications. The search results will be delivered by email.


To order a Custom Search, contact Jim


Mehl at jmp@agiweb.org, (703) 379-2480 ext 236 or Monika Long at ml@agiweb.org.


The cost of a custom search is $225.00 plus $.45 per reference.


Please mention AIPG when ordering your custom search.





www.aipg.org


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56