Rendering of the New Stanford Hopsital, designed by Rafael Viñoly Architects, in association with PerkinsEastman and under construction by Clark/McCarthy joint venture.
Information Modeling (BIM) and BIM 360 has been used to minimize field clashes, facilitate communication, and tie QR codes to specific locations, offering instant access to building data (among other things).
Extensive prefabrication has been enabled by BIM modeling, with large portions of the mechanical, electrical and plumbing systems delivered preassembled on site.
Te team has employed various technologies to facilitate different
aspects of the project, such as Project Inertia to manage inspection requirements and Plan Grid for electronic document control.
Laser scanning has been used for both pre- and post-load scans of
FIRST IN SERVICE SINCE 1979
WWW.TPRCO.COM
SHORING AND SAFETY SPECIALISTS EXCAVATION SHORING
Serving the legal needs of
California’s construction industry for over 35 years with repeated recognition by Chambers USA
Construction Disputes Labor and Regulatory Public Works Worksite Safety Real Estate Corporate & Tax
Litigation: Class Action, Unfair Business Practices Defense
Cerritos · Fresno · Irvine · Pasadena · Pleasanton Riverside · Sacramento · San Diego
www.aalrr.com
10 May/June 2016
PIPELINES RETROFITS PILING FOOTINGS & FOUNDATIONS VAULTS BORE PITS
TRENCH PLATE® RENTAL CO
EQUIPMENT SERVICE SOLUTIONS Locations throughout California, Nevada, Texas, Illinois, and Florida
800 821-4478 California Constructor
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24